Consultancy services for carrying out detailed Survey Investigation Preparation of Drawings Designs Estimates Reports and BOQ for Civil works for filling up of Indaragi & other 27 Nos of MI/ZP tanks for providing drinking water supply to the surrounding villages coming under Gangavathi constituency Gangavathi Taluk, Koppal district by lifting water from Tungabhadra River
Client:
M/s Karnataka Neeravari Nigam Ltd
Project Description:
Gangavati is a city, Municipality, and taluk in the Koppal district of the Indian state of Karnataka. It is one of the main commercial hubs in the Kalyana-Karnataka region.
This project is proposed to fill 28 No’s of MI/ZP tanks in and around Gangavathi Constituency of Gangavathi Taluk, Koppal Taluk and District. The scheme envisages lifting water from downstream Tungabhadra River in rainy season excess flood water near Gaddimadi village of Koppal Taluka of Koppal District to fill the 22 tanks present on the upstream side of the river as Lift 1 and to fill 6 tanks from Bleeder 2 of Mukkumpi tank filling Scheme Venkatagiri tank as Lift 2 scheme.
Lift -I consist of construction of Intake,forebay,Jackwell to accommodate 3 No’s of Vertical Turbine Pumps each of capacity 1685 HP (SH-198m & PH-281m,33/6.6 KV Electrical substation with 2 No’s (1working+1standby) 4 MVA capacity of Transformer including construction of Terminal Bay, 33 KV transmission line Estimates for the Length of 15km. MS Rising Main for pipe length – 40.919 km Lift -I (Dia varies from 750 mm to 186.40mm) and MS & HDPE Pressure distribution network for a length of 45.710 km For both Lift -I(Dia varies from 400 mm to 90 mm)
Lift -II consist of construction of Jack well to accommodate 2 No’s of Vertical Turbine pumps each of capacity 290 HP (SH-96 m & PH-134.00m), 11/0.433 KV Electrical substation with 2 No’s (1working+1standby) 600 KVA capacity Transformer including construction of Terminal Bay,11 KV transmission line Estimates for the Length of 14km. MS Rising Main for pipe length – 11.11 km Lift -II (Dia varies from 347.60 mm to 200 mm) MS & HDPE Pressure distribution network for a length of 15.837 km For both Lift -II (Dia varies from 260 mm to 125 mm)
The total cost of the project is 241.20 crore.